Stage 6: Building the swimming pools and excavating garage access
Villa Mozart has really moved forward since our last update. The first floor is now complete, with the terrace now in place which will house the rooftop pool. You can now clearly see how this will project over the master bedroom terrace and will be visible through the windows set into the terrace roof. At the same time, the garage entrance has been excavated to allow vehicular access to the lower level.