Stage 5: Building the outdoor pool and terrace
The steel mesh and formwork is put into place to form the walls of the new basement area. Once the concrete walls have been poured, the roof panels are dropped into place, which also serves as the terrace around the outdoor swimming pool and jacuzzi. Waterproofing begins on the external basement wall.