Stage 7: Laying the terrace surfaces and building the retaining walls
Now that the last remaining elements of the façade have been finished, with just the pergola for the chill out area by the jacuzzi to complete, work turns to laying the tiled surfaces of the extensive outdoor terraces around the pool. At the same time, the retaining walls are being filled in to provide areas for vegetation to be planted.