Stage 6: Finishing the façade, terraces, and swimming pools

The façade is now almost completed, with just the pillars for the upper floor terrace and the pergola still to be plastered. Meanwhile, a concrete screed has been laid over the waterproof layer, both on the terraces and in the outdoor and indoor pools, prior to putting down the final finished surfaces.
DSC_0091

DSC_0099

DSC_0101

DSC_0105

DSC_0108

DSC_0117

DSC_0127

DSC_0131