Stage 5: Plastering the façade and waterproofing the terrace
Construction work on the house is now completed, so plastering of the external walls has begun. At the same time, the terraces surrounding the outdoor pool have been waterproofed, as these areas will eventually be grassed over, and the pergola that will house the chill-out area and bar next to the jacuzzi has also been built.