Stage 11: Work continues inside and out

Both the indoor and outdoor swimming pools and jacuzzis at Heaven 11 are now almost complete, with the large-format tiles cut and fitted to the interior. Outside the villa, landscaping work continues with the garden around the pool being prepared to lay lawn. Inside, work continues on finishing the property: the lift has now been installed, bathroom fixtures are being put in place prior to tiling, and the interior doors and decorative elements fitted.

05-16_5234

05-16_5241

05-16_5242

05-16_5246

05-16_5247

05-16_5251

05-16_5254

05-16_5256

05-16_5261

05-16_5263

05-16_5268

05-16_5269