Stage 2: Construction work continues
Work continues on the new wing, with the lower floor completed and rendered and the new terrace above the entry now in place. The level of the garden surrounding the pool has been raised. Work on the master bedroom suite, which has incredible views over the surrounding area to the Mediterranean, is now almost complete, with just the flooring to be fitted.