Villa Tranquilla: installing systems and fittings
With the structural work complete, the interiors were wired and plastered, before fitting the underfloor heating system and laying down the marble flooring. At the same time, decorative external woodwork was put into place and painted, prior to finishing and painting the rest of the villa.